Jacilyn Hayden

Pacific Northwest AEC

Sample edition · November 10, 2026

Bridge leadership, island access, aviation fuel, and clean water

Four infrastructure stories and the decisions that will shape them.

This edition covers four topics. A bridge program has named a permanent administrator. Ferry restrictions can delay deliveries to an island. Washington offers tax incentives for aviation fuel. Local communities need funds to improve water systems.

Washington / Oregon · Project delivery

A leadership change across the Columbia

The Columbian reported that Ron Paananen will become the permanent administrator of the Interstate Bridge Replacement Program on December 2, replacing interim administrator Carley Francis. The I-5 bridge connects the Vancouver and Portland regions. Coverage from The Columbian.

Watch next: Public milestones for scope, funding, schedule, and construction sequencing.

Orcas Island, Washington · Asset condition and access

Ferry restrictions can delay deliveries to Orcas Island

KING 5 reported restrictions on large vehicles at the Orcas Island ferry terminal after cracks were discovered in support beams. Coverage from KING 5.

Watch next: Inspection findings, repair decisions, and provisions for essential freight.

Washington statewide · Energy and industrial development

Aviation fuel production requires facilities and utilities

GeekWire reported that Washington reached a sustainable aviation fuel production-capacity threshold that activates state tax incentives. The threshold measures capacity, rather than actual fuel output. Its reporting describes activity in Moses Lake and a planned facility in Walla Walla County. Read Lisa Stiffler’s reporting in GeekWire.

AEC perspective: Scaling a fuel industry requires production facilities, utilities, storage, transportation links, and suitable sites. Aviation policy connects directly to engineering, construction, and industrial land use.

Watch next: Which proposals advance into financed, permitted projects, and how power availability and feedstock supply shape their timing and location.

Washington statewide · Environment & Resilience

What Washington’s water funding requests reveal

Washington Ecology received 172 applications requesting $664.5 million for its state fiscal year 2028 Water Quality Combined Funding cycle. The program supports work such as wastewater treatment and stormwater improvements. Washington Ecology’s funding cycle and application list.

AEC perspective: The requests give residents and project teams an early look at where communities want to invest. The local capital plan can show what each proposal would improve. It can also show related projects and the owner’s estimated costs.

Watch next: Ecology expects a draft offer list by January 31, 2027. Compare the draft list with the applications to see which proposals advance. Check local budgets for the next design or construction decision.

On the project radar

  • US 2 trestle replacement

    The Everett Herald reported that WSDOT presented its preferred design for the US 2 trestle replacement to a state Senate committee. A public open house is planned for December. Everett Herald.

  • Renton Transit Center connections

    Seattle Transit Blog described King County Metro’s proposed service changes for the new Renton Transit Center, which opens in 2028. Metro’s survey is open through November 30. Seattle Transit Blog.

A question for the next project meeting

When a critical asset becomes unavailable, who loses access first? What alternatives exist, and how long can they work?

The Orcas terminal story makes those questions immediate. They also belong in conversations about bridge rehabilitation, utility work, transit construction, and access to job sites.